Design & Construction BIM

We have developed our own BIM solution to establish a perfect construction
and process plan. Through this, we are operating an automated system
for fast and accurate data generation and applying parametric techniques
using algorithm to respond quickly to planning changes.

Build an Open-BIM environment
to perform purpose-oriented BIM tasks

Parametric Design

Open-BIM

+

Field-BIM

+

Purpose-oriented
BIM practice

Design & construction
BIM experts

Perform BIM practice,
development in parallel

Use a variety of BIM tools to quickly and accurately produce BIM data that is ready to use

Design and construction-specific BIM engineers who understand construction and process and focus on construction consulting

Development of practical BIM solutions based on BIM practice and algorithmic process for all personnel in the team

시공 bim 추가_영문.png

01

Create BIM models by type of construction

1 day of earthwork and 5 days of frame, BIM completed

BIM models for each field are created by differentially applying Level of Development (LOD) according to the characteristics of the project, such as architectural structure civil engineering and MEP. Some complex BIM models are automatically produced using algorithmic process techniques (Grashoper, Dynamo). It secures a rapid BIM model within the shortest period of time after receiving the drawing using manpower from the Vietnam branch.

설계·시공 BIM

02

Review of consistency of design books

Pre-Construction Design Quality Assurance

Design Document Quality Assurance through BIM-Based Consistency Review
We conduct consistency reviews of design drawings using discipline-specific BIM models. By identifying errors, omissions, and clashes before construction begins, we aim to ensure the delivery of complete and accurate drawings.
Given the nature of our work, we go beyond detecting issues in the drawings themselves—we also identify constructability issues where actual implementation may be infeasible. These are highlighted and addressed to ensure the drawings are construction-ready.
In cases where construction methods are rapidly changed or missing drawings exist, we proactively review the BIM models in advance to prevent disruptions on site.
All review results are documented and submitted in detailed report form.

설계·시공 BIM

03

Calculation of quantity for construction and process planning

Calculation of quantity by zoning, floor, and member

BIM can extract accurate building shape and quantity information by converting 2D drawings into three dimensions, but the quantity information extracted from the BIM tool is not readable enough to be used immediately for construction. Therefore, it is provided that it can be used immediately at the site (construction team) by calculating the quantity based on the daily amount of construction per C.J. (Construction Joint), zoning, and construction quantity. A separate solution is being developed and utilized within the team by using Grashopper to calculate the quantity information that can be used immediately for construction and process planning.

설계·시공 BIM

04

Workability review with BIM

BIM= Construction site match, digital twin

The construction stage, the pre-execution risk through actual virtual construction is reviewed in advance using BIM. The construction equipment and temporary materials reflecting the specifications of the actual catalog are applied to the integrated BIM model to review the construction plan for each stage of earthwork, frame work, and finishing work including the hypothesis plan. The virtual construction simulation is performed in the state of BIM= site where the digital twin is built by implementing the BIM and construction site as identical as possible.

설계·시공 BIM

05

Review of the process plan using BIM

Visualization management of the process plan

4D simulation is constructed by linking the network schedule and BIM. The process plan is reviewed through the overall process simulation review by reflecting the construction plan and the main application method. The relationship between the process line and the following is analyzed, and the interference of the complex process is reviewed on a daily basis. In the execution stage, the execution rate is managed through Plan vs Actual management.

설계·시공 BIM

06

BIM solution development

Purpose-oriented BIM data production

The team is conducting practical work and development internally to produce data that can be used immediately in the field. It is striving to cultivate algorithmic process-based parametric engineers, and improves the quality of development by immediately applying Lessons Learned through practical application to development. Practitioners perform one task per person so that accurate data can be quickly reflected in construction and process planning through practical development.